Kitchen Demolition – 09/30/06

Comments Off on Kitchen Demolition – 09/30/06

Our first big demolition day was great. When we were done we felt like we had really accomplished a lot:

Prep work...removing the cabinet doors from the built-in.

Prep work…removing the cabinet doors from the built-in.

Patrick proudly showing off the pile of drop-ceiling.

Patrick proudly showing off the pile of drop-ceiling.

Patrick examining the hardcore built drop-ceiling structure.

Patrick examining the hardcore built drop-ceiling structure.

Removing the wood paneling.

Removing the wood paneling.

Tackling the plaster.

Tackling the plaster.

Arrrrrrrggh.

Arrrrrrrggh.

Half-way through removing the drop-ceiling beams...or so he thought...

Half-way through removing the drop-ceiling beams…or so he thought…

Some kind of vent pipe or something.

Some kind of vent pipe or something.

The cut pipes (done pre-purchase) and rotten wood.

The cut pipes (done pre-purchase) and rotten wood.

More water damage to the hardwood floors and the plywood to replace it.

More water damage to the hardwood floors and the plywood to replace it.

End of day one...quite an achievement!

End of day one…quite an achievement!

The pile of demolition stuff (pre-dumpster) stored in the laundry room.

The pile of demolition stuff (pre-dumpster) stored in the laundry room.

Comments are closed